Chris and his boys arrive earlier than scheduled, which was what I had been pushing him for, but it finally dawned on me the huge task in front of me.
The unit is stripped bare within 3 days.
The machine I want is Flame Red La Marzocco FB70, which normally has a lead time of 6 weeks, so I’d better get a move on it if I want to open before Christmas.